House lifting for camps and cottages
A great deal of our lifting happens out at camp, where buildings were originally set on posts, blocks or bare rock and have spent thirty winters moving with the frost. We have raised cottages nearly eight feet so a proper poured foundation could go in where there had only ever been posts, and raised camps to pull out rotten beams and re-sill them on new pressure-treated timber.
Access is usually the hard part, not the lift. We plan the route in, the cribbing and the concrete before the first jack goes under, because a camp job that stalls halfway is a camp job sitting on cribbing through a thaw.



